Oswald Road to Station
Link from top of Oswald Road to the Station at Ridgemont Road
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of St Albans Cycle Campaign:
Created by Angela Dyer // 1 thread
Link from top of Oswald Road to the Station at Ridgemont Road
Created by Angela Dyer // 0 threads
Enable cycling Southwards on Upper Marlborough from jn with Bricket Road
Created by Angela Dyer // 0 threads
Contraflow on whole of drive to Batchwood
Created by Angela Dyer // 1 thread
Dropped kerb at end of North Cottages, London Colney, to cycle path.
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 0 threads
Remove barriers Grindcobbe to Sainsburys
Created by Angela Dyer // 0 threads
Resurface joint use cycleway on Harpenden Road opposite sports ground
Created by Angela Dyer // 0 threads
Convert footway to joint use between Old Harpenden Road and STAGS
Created by Angela Dyer // 0 threads
Cycle lanes along Sandridge Road
Created by Angela Dyer // 0 threads
Sandpit Lane. Remove pinchpoint islands, St Saviours Church to Rail bridge
Created by Angela Dyer // 0 threads
Provide a route and/or improve conditions for cyclists at Hatfield Road/Ashley Road / Beechwood Ave junction (existing double mini-roundabout)
Created by Angela Dyer // 0 threads
Shenley Lane: create cycleway St Annes Road to Bell Lane/Harper Lane roundabout
Created by Angela Dyer // 0 threads
Herons Way: Create cycle access at London Road end
Created by Angela Dyer // 0 threads
Remove on-pavement cycle path on Beechwood Avenue leading to Hatfield Road junction
Created by Angela Dyer // 0 threads
Shenley Lane: Create cycleway Napsbury Ave to St Annes Rd
Created by Angela Dyer // 1 thread
Links to hospital (County Council scheme) details not available
Created by Angela Dyer // 0 threads
Pedestrian phase on St Albans arm of London Colney roundabout
Created by Angela Dyer // 0 threads
Close Blandford Road, Glenferrie Road, Sandfield Road, and Harlesden Road with Burnham Road (Fleetville) to motor vehicles except for access
Created by Angela Dyer // 0 threads
Sign Nightingale Lane as a cycle route to London Colney roundabout
Created by Angela Dyer // 0 threads
Dropped kerb on New House Park at start of Herons Way bridleway
Created by Angela Dyer // 0 threads
Signs on Jersey Lane to Jersey Farm shops
Created by Angela Dyer // 0 threads
Link from Alban Way through the former temporary housing site to the roundabout on Hill End Lane/Sovereign Park (paid by developer?)
Created by Angela Dyer // 0 threads
Complete dual use footway A405 Park Street roundabout to Old Watford Road, Bricket Wood
Created by Angela Dyer // 0 threads
Oakdene Way - Pinewood Close upgrade FP, plus drop curb at east end
Created by Angela Dyer // 0 threads
Shenley Lane: Create cycle route Napsbury Ave (London Colney) to Napsbury Lane jn with Herons Way
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Route proposal for the link from Prospect Road/Verulamium Park to the start of the Alban Way.
The route is a shared, wide, pavement with a width around 3 metres- in line with minimum width for a shared route.
Documents are available at http://www.stalbans.gov.uk/planning/Planningpolicy/greenring/hccsiteb.aspx
Please have a look at the thread on this as there are a few point which STACC will bring out, you may want to consider these in your response.
Please return any comments to Clare Martin via phone, email or post.
Please also contact Clare if you have any further queries about the proposed works.
Clare Martin
Project Engineer, Integrated Transport Planning
Highways
Postal Point CHO317
Hertfordshire County Council, Leahoe Annexe, Pegs Lane, Hertford, SG13 8DN
t: 01992 658478 Comnet / Internal: 58478
email: Clare.Martin@hertfordshire.gov.uk
Created by John Metcalf // 1 thread
"Hertfordshire County Council (HCC) has recently undertaken a feasibility report to investigate cycle links to the new Verulamium Park (Ver Park) Route link to NCN 6 from the King Harry Lane area. We have looked at ways to improve the cycling and walking environment; particularly where this would improve the continuity of cycle routes and the movement of people via active modes around your area. A section of shared use cycle route has been recently provided by the developer Linden Homes and the intention is to extend this facility to Abbey Avenue and northwards towards The Ramparts via an upgraded traffic signal crossing point into Verulamium Park.
The proposals include the following:
· Upgrade the existing traffic signal controlled crossing near Verulamium Park access to a Toucan Crossing,
· To provide improvements to the footway areas on both sides of the traffic signal controlled crossing to make it both suitable for pedestrians and cyclists, and linking into the new section of shared use footway/ cycleway that the developer has recently provided.
· To the south of the new roundabout, on the western side, the existing footway will be widened from 0.9-1.1m to 2.5m to continue the shared use route towards Abbey Avenue.
To upgrade the existing uncontrolled crossing at King Harry Lane jw Abbey Avenue by increasing the widths of the existing pedestrian refuge to widths that can accommodate both cyclists and pedestrians.
This option has been carefully evaluated and full consideration has been given to the likely effects that it may have on residents.
Please find attached a plan which shows details of the proposed scheme for Ver Park Highway Link (Cycleway/ Footway).
At this stage we are intending to implement the proposals during the next financial year, 2014/15.
As such we are now finalising the design and we are interested in hearing your views or any comments you may have regarding the proposals"
Initial comments by John Metcalf
Overall to be welcomed as better than what is there already. But, it could be improved?
1. Traffic entering Abbey Avenue is likely to be going too fast for a safe crossing for those walking or cycling. This is a rat-run to avoid the King Harry roundabouts. Therefore tighten the radii of the junction and make a raised crossing (on a hump). Do we want a Tiger (Zebra for walkers and cyclists) crossing?
2. The crossing of the new roundabout exit into King Harry Park is hazardous. It needs to be upgraded with a humped crossing (and a Tiger?). Is this sufficient or should there also be measures to slow down the traffic entering and leaving King Harry Park.
3. The best solution would be to upgrade the ROW footpath from the toucan crossing of King Harry Lane to Rowlatt Drive
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)